1. Negative wire of the storage battery. |
2. To merge cooling liquid. |
3. Gear belt. |
4. The inlet pipeline with laying. |
5. The final pipeline with laying. |
6. Ignition distributor. |
7. A cover of the klapanny mechanism with laying. |
8. Cam-shafts 19 and pushers 20. |
9. Natyazhitel 53 belts and intermediate roller 55. |
10. Hairpin of the 68th cover of a gear belt. |
11. Bolts of the 30th fastening of a head of cylinders.
Prevention
At first to unscrew all bolts of a head of cylinders on 1/4 turns in the sequence shown on fig. Sequence of an otvorachivaniye of bolts of a head of the block of cylinders. Then in the same order to unscrew all bolts on 1/2 turns.
|
12. Head of cylinders 33. |
13. To clear the interfaced planes of a head and the block of cylinders. |