Daewoo Nexia

since 1994 of release

Repair and car operation



Deu Neksiya
+ Maintenance instruction
+ Maintenance
+ Engine
- 3. Engine (two top camshafts)
   3.2. General description
   3.3. Operation of hydraulic jacks of gaps
   3.4. Greasing system
   3.5. Maintenance and repair
   3.6. Compression check
   3.7. Dismantle and engine installation assembled
   3.8. Maple belt
   3.9. Engine support
   3.10. Inlet collector and laying
   3.11. Final collector and laying
   3.12. Cover of the klapanny mechanism and laying
   3.13. Pulley of a cranked shaft
   3.14. Forward cover of a gear belt
   3.15. Gear belt
   3.16. Natyazhitel of a gear belt
   3.17. Camshaft cogwheel
   3.18. Cogwheel of a cranked shaft
   3.19. Back cover of a gear belt
   3.20. Forward consolidation of a cranked shaft
   3.21. Camshaft. Hydrojacks of gaps of valves
   3.22. Head of the block of cylinders
   3.23. Repair of a head of the block of cylinders
   3.24. Klapannye of a spring. Consolidations of cores of valves
   3.25. Dismantle of valves
   3.26. Directing plugs of valves
   3.27. Expansion of openings of plugs
   3.28. Valves
   3.29. Klapannye of a spring
   3.30. Saddles of valves
   3.31. Oil pallet
   3.32. A reception branch pipe with the oil filter
   3.33. Oil pump
   3.34. Repair of the oil pump
   3.35. Pistons and rods
   3.36. Flywheel. Back consolidation of a cranked shaft
   3.37. Cranked shaft
   3.38. Rods and radical bearings
   3.39. Replacement of loose leaves
   3.40. Piston fingers and rings
   3.41. Block of cylinders
   3.42. Installation of pistons
   3.43. Disk balancing with a gear wreath
   3.44. Repair of carving openings
   3.45. Diagnostics of malfunctions
+ cooling System
+ Toplevnaya and exhaust systems
+ Electric chain
+ 7. Ignition system
+ 8. Electronic control unit and sensors
+ Transmission
+ 10. Five-speed transmission and main RPO MM5 broadcast
+ 11. Automatic Transmission
+ Steering
+ Running gear
+ 14. Forward suspension bracket
+ 15. Drive of forward wheels
+ 16. Back suspension bracket
+ Brake system
+ Body
+ Heating, ventilation
+ Electric equipment


8128da4b



3.11. Final collector and laying

GENERAL INFORMATION

Dismantle of a heat-shielding casing

 


Dismantle of a final collector with laying

 


Sequence of an inhaling of nuts of a final collector

 


To remove or disconnect

PERFORMANCE ORDER
1. Negative wire of the storage battery.
2. Wire of the sensor of 42 concentration of oxygen.
3. A heat-shielding casing In, having unscrewed three bolts And.
4. Oil щуп 111.
5. To lift the car and to dismantle a dual exhaust pipe 44 with laying 43.
6. A final collector 41 and laying 40, having unscrewed 9 nuts 38. The interfaced planes of a head of cylinders and a final collector.

To establish or attach

PERFORMANCE ORDER
1. A final collector 41 with new laying 40.
2. To screw eight nuts 38 with washers 37. To tighten nuts of fastening of a final collector the moment of 22 Nanometers in the sequence shown on fig. Sequence of an inhaling of nuts of a final collector.
3. To lift the car and to establish a dual exhaust pipe 44 with laying 43 by means of three nuts 47. To tighten nuts of fastening of a dual exhaust pipe the moment of 25 Nanometers.
4. Oil щуп 111.
5. A heat-shielding casing In a final collector 41, having screwed up three bolts And.