Daewoo Nexia

since 1994 of release

Repair and car operation



Deu Neksiya
+ Maintenance instruction
+ Maintenance
+ Engine
+ 3. Engine (two top camshafts)
+ cooling System
- Fuel and exhaust systems
   5.2. System of injection of fuel
   5.3. Modes of functioning of system
   - 5.4. Main knots of system
      5.4.1. Fuel tank, pump and pipelines
      5.4.2. Distributive fuel pipeline
      5.4.3. Fuel nozzles
      5.4.4. Regulator of pressure of fuel
      + 5.4.5. Butterfly valve case
      5.4.6. Relay of pressure of oil
      5.4.7. Relay of turning on of the fuel pump
      5.4.8. Check of giving of the fuel pump
      5.4.9. Fuel tank
      5.4.10. Accelerator pedal
      5.4.11. Fuel filter
      5.4.12. Fuel pump
      5.4.13. Dumping of pressure of fuel in system
      5.4.14. Distributive fuel pipeline
      5.4.15. Fuel nozzles
      5.4.16. Regulator of pressure of fuel
      5.4.17. Butterfly valve case
      5.4.18. Sensor of provision of a butterfly valve (DDZ)
      5.4.19. Valve of idling (KHH)
      5.4.20. Replacement of the case of a butterfly valve
      5.4.21. System of compulsory ventilation of a case (SPVK)
      5.4.22. Check of functioning of the valve of ventilation of a case (KVK)
      5.4.23. System of production of the fulfilled gases
      5.4.24. Catalytic converter
      5.4.25. Reception exhaust pipe and catalytic converter
      5.4.26. The forward exhaust silencer with an intermediate exhaust pipe
      5.4.27. The back exhaust silencer with an exhaust pipe
+ Electric chain
+ 7. Ignition system
+ 8. Electronic control unit and sensors
+ Transmission
+ 10. Five-speed transmission and main RPO MM5 broadcast
+ 11. Automatic Transmission
+ Steering
+ Running gear
+ 14. Forward suspension bracket
+ 15. Drive of forward wheels
+ 16. Back suspension bracket
+ Brake system
+ Body
+ Heating, ventilation
+ Electric equipment


8128da4b



5.4.25. Reception exhaust pipe and catalytic converter

To remove or disconnect

PERFORMANCE ORDER
1. To turn out bolts of 3 fastenings of a reception pipe to the final pipeline.
2. To unscrew nuts of bolts of the 7th fastening of converter.
3. To remove a reception pipe and converter.
4. To take out old consolidation 1.

To clear

PERFORMANCE ORDER
Condensed surfaces of a flange and the final pipeline.

To establish or attach

PERFORMANCE ORDER
1. New consolidation 1.
2. Reception pipe and converter.
3. Fixing bolts and converter nuts.
4. Fixing bolts of a reception pipe. To tighten bolts of fastening of a reception pipe to the final pipeline the moment of 20 Nanometers. To tighten nuts and bolts of fastening of converter to a reception pipe the moment of 20 Nanometers.